The Challenge
Engineering constraints the brief would not forgive.
Managing immense wind-shear forces on the infinity wet-edge and ensuring zero acoustic bleed into the penthouse directly below. The cantilevered edge suspends 4 metres beyond the primary slab line, creating amplified lateral loads at extreme elevation.


