What Bundaberg Central does to a aquatic centres build
Warm, humid, and prone to tropical lows; designed for high-capacity drainage. For aquatic centres specifically, the exposure that matters is high humidity, biological load and torrential summer storm inflow. Our response on Bundaberg Central sites is aggressive overflow engineering, higher sanitiser duty, and ventilation design that keeps indoor halls off the condensation threshold. Institutional and municipal vessels here are judged on uptime and compliance long after handover, so plant is sized for the busiest realistic day, accessibility is designed in against AS 1428, and the commissioning record is written for the operator and the auditor, not for us.


