What Ipswich does to a 25m semi-olympic build
Inland climate prone to significant flooding; requires strict hydrostatic pressure mitigation. For 25m semi-olympic specifically, the exposure that matters is hydrostatic uplift when the water table rises during flood events. Our response on Ipswich sites is hydrostatic relief valving, deeper anchorage, and a shell designed to survive being emptied at the wrong moment rather than floating. Institutional and municipal vessels here are judged on uptime and compliance long after handover, so plant is sized for the busiest realistic day, accessibility is designed in against AS 1428, and the commissioning record is written for the operator and the auditor, not for us.


